Khudda Lahora Flyover on Madhya marg extension

₹89.13 Crore Khuda Lahora Flyover: A Major Connectivity Boost for New Chandigarh

Date: 24 August 2026

Khudda lahora fly over news by Times of India
Khudda lahora fly over news update

The proposed ₹89.13 crore Khuda Lahora Flyover/Elevated Corridor is expected to become one of the most important infrastructure developments strengthening connectivity between Chandigarh and New Chandigarh.

The Chandigarh Administration is moving forward with a major infrastructure proposal for the construction of a four-lane, high-capacity elevated corridor at Khuda Lahora on Madhya Marg. The project has been designed to address increasing traffic congestion on one of the busiest road stretches connecting Chandigarh with New Chandigarh, Mullanpur, Kurali, Baddi and other parts of Punjab and Himachal Pradesh.

Project at a Glance

  • Total Project Cost: ₹89.13 Crore
  • Total Flyover Length: 1,280 metres
  • Stilted/Elevated Portion: 850 metres
  • Wall/Solid Fill Portion: 430 metres
  • Total Width: 19.1 metres
  • Carriageway: 14 metres
  • Service Road: 7.5 metres on each side
  • Footpath: 1.5 metres on each side
  • Minimum Vertical Clearance: 5.5 metres

Why This Flyover Is Important

The Khuda Lahora stretch of Madhya Marg has emerged as a major traffic bottleneck due to rapid urbanisation and the increasing number of vehicles travelling between Chandigarh and New Chandigarh. During morning and evening peak hours, commuters frequently experience heavy congestion.

The proposed elevated corridor aims to provide a smoother and faster movement of traffic while allowing local traffic to use the service roads below. This will help improve overall traffic management and road safety in the area.

A Major Advantage for New Chandigarh

For New Chandigarh, this project could be a major connectivity milestone. The region is witnessing continuous residential, commercial and institutional development, resulting in increased daily movement between Chandigarh and Mullanpur.

Once completed, the elevated corridor is expected to:

  • Improve connectivity between Chandigarh and New Chandigarh
  • Reduce traffic congestion during peak hours
  • Save travelling time for daily commuters
  • Improve connectivity towards Mullanpur, Kurali and Baddi
  • Provide safer movement for local and inter-state traffic
  • Support future residential and commercial development
  • Strengthen New Chandigarh’s connectivity with Chandigarh

Modern Infrastructure Features

The proposed project includes several modern infrastructure and traffic management features. These include precast construction technology, reinforced earth walls, crash barriers, drainage systems, street lighting, footpaths and other traffic-safety measures.

The planning also focuses on improving the durability of the infrastructure while reducing unnecessary fuel consumption and vehicle emissions caused by prolonged traffic congestion.

Project Cost Break-Up

Component Estimated Cost
Stilted Portion ₹60.93 Crore
Wall/Solid Fill Portion ₹9.05 Crore
Main Road, Service Roads & Junctions ₹12.18 Crore
Contingency Charges ₹2.46 Crore
Shifting of Water & Sewer Lines ₹2 Crore
Raising of High-Tension Line ₹2 Crore
Forest Clearance ₹25 Lakh
Shifting of Electrical Lines ₹25 Lakh
Total Project Cost ₹89.13 Crore

Current Approval Status

The project has already undergone multiple levels of technical and financial scrutiny. The Chandigarh Heritage Conservation Committee has also approved the proposal. The next important step is the financial and administrative approval by the appraisal committee, which is headed by the Chief Secretary.

Our Perspective:

The proposed Khuda Lahora Flyover is much more than a road infrastructure project. It has the potential to significantly improve the daily connectivity between Chandigarh and New Chandigarh. As New Chandigarh continues to grow as an important residential, commercial and institutional destination, improved road infrastructure will play a crucial role in supporting its long-term development and future growth.

This ₹89.13 crore infrastructure project could become an important milestone in the future connectivity story of New Chandigarh.

Disclaimer – News update by Times of India